Mat3
Start free
Core features / Submission revisions

Know which version you reviewed.

Keep the approved requirement and the exact supplier product together. Revised documents create a new revision and leave the earlier record intact.

  • Approved requirement baselines are versioned
  • One selected product per submission revision
  • Earlier decisions keep their original inputs
Actual generated PDF · baseline v1 and supplier revision 2

See it working

A completed test you can inspect.

Tested in the hosted Mat3 workspace
Run by the Mat3 team · no customer data

Input
Revision 1: Menandro 600 × 1200 mm, polished. Revision 2: Losa CRM 600 × 600 mm, matt. Both use approved baseline v1.
What we did
We created a new revision of the same supplier submission, selected the changed product and completed a fresh comparison, decision and two reports.
Saved result
Revision 2 has its own findings and decision. Revision 1’s inputs, findings and decision stayed unchanged; its original PDF and CSV retained identical file hashes.

What the test confirmed

  • A changed supplier product creates revision 2
  • The comparison pins baseline 1 and supplier revision 2
  • Revision 1 inputs, findings and recorded decision remain unchanged
  • The completed revision 1 product selection cannot be changed
  • Revision 1 PDF bytes remain unchanged
  • Revision 1 CSV bytes remain unchanged

Completed with published documents and controlled test accounts. These are product checks, not customer endorsements or certification of material quality. Get the public test documents.

How it works

Three steps to use it.

01

Add the supplier documents

Select the pages for the offered product.

02

Confirm the variant

Check its size, finish and reference against the source.

03

Compare that revision

Keep the selected product and baseline in the decision.

01

Choose the exact product and variant.

A catalogue may show several sizes, finishes or product references. Gemini extracts candidates with their source evidence. Select the offered variant before starting the comparison.

  • Different dimensions are separate candidates
  • The selected product is pinned to its revision
  • Ambiguous or contradictory details require clarification
Inspect this feature’s evidence
Published CDK catalogue · original PDF page 21
02

A changed input gets a fresh comparison.

New supplier files, a changed product or revised project requirements must be reviewed against the right versions. Approved baselines and completed decisions are preserved.

  • New requirements need a newly approved baseline
  • Supplier changes create a new revision
  • Reports continue to show their original review
Inspect this feature’s evidence
Actual hosted material record · revision 2 and earlier reviews retained

Your questions

Good to know before you start.

Can I upload more documents after a decision?

Yes. Add a new supplier revision using the new documents and review it separately. The completed decision and its report remain tied to the earlier revision.

What if the project specification changes?

Edit the draft requirements, check their evidence and approve a new baseline. Start a new comparison against that baseline instead of changing an older approved record.

Bring your project documents.

Start with one requirement and one proposed product. Check the result with your reviewer.