Mat3
Start free
All resources

Review guides

From supplier documents to a recorded decision

Follow the complete Mat3 workflow: requirements, supplier selection, findings, clarification, decision and report.

Actual workspace · completed public-document paint review

Set up the project and requirement.

  1. Create a project and add a material item. Record its category and intended use, and assign a reviewer.
  2. Upload your specification, BOQ or finish schedule and select the relevant pages.
  3. Extract a requirement draft. Check every value and its source, add missing details and approve the baseline.

Choose what the supplier is proposing.

Upload the supplier’s documents and create a submission. Gemini extracts product candidates with source references. Choose the exact product, size and finish offered before comparison.

One submission revision represents one proposed product for that material item. A changed product or new documents require a new revision.

Run the review and inspect the evidence.

  1. Start the comparison against the approved baseline.
  2. Wait for the saved processing job to complete. If it fails, inspect the error and retry after correcting the issue.
  3. Read each finding and open the requirement and supplier sources.
  4. Record any correction with a reason, or ask for clarification when the evidence is insufficient.

Ask a clear supplier question.

Prepare a draft from unresolved findings. Check the subject and wording, save it, then copy or download it to share through your usual email or messaging app.

When new documents arrive, add a supplier revision and compare again. The previous question and review remain in the record.

Record the decision and its conditions.

The assigned reviewer can record Approved, Approved with conditions, Revise and resubmit or Rejected. Required unresolved findings block unconditional approval. Conditional approval needs an explicit condition for every outstanding required finding.

Corrections preserve the original machine finding and record the reviewer’s reason. The decision is tied to the baseline and supplier revision used in that review.

Generate the report and return to it later.

After recording a decision, generate PDF or CSV. The report includes the project, material, supplier, reviewed versions, findings, sources, reviewer corrections, conditions and recorded decision.

Reopen the saved review to download the same report. Later documents and changed requirements create new versions and new comparisons; they do not rewrite the earlier report.

Assign the people who need access.

Company owners manage membership and project assignments. Contributors upload documents. Reviewers approve requirements and the reviewer assigned to a review issues its decision. Viewers read the projects they can access.

Hosted accounts require verified email. Invitations are tied to a work email and expire after seven days. Private files are served only after company and project access checks.

See the procedure and the result.

Inspect the completed public-document case study, or bring your own project files and start a review.