State the material and the issue.
Identify the project material, the supplier’s product and the exact requirement in question. Include the required value and the submitted statement instead of a general request to ‘confirm compliance’.
- Material item and product reference
- Approved requirement and its source
- Supplier statement and its source
- The missing detail or conflicting value
Prepare and check the draft in Mat3.
- Open the completed comparison and inspect the unresolved findings.
- Choose Draft supplier question. Read the generated subject and message.
- Correct the wording and remove assumptions that the sources do not support.
- Save the draft, then copy or download it to send through your team’s normal channel.
Example: satin required, matt submitted.
The public paint test selected a satin finish from the IOM Nigeria BOQ. The archived manufacturer excerpt described the proposed Vinyl Matt product as matt. The saved clarification asked for a satin variant or a documented finish change approved by the reviewer.
That question concerns the finish. Brand equivalence, the coating system, site suitability and current product availability remain separate matters for the project reviewer.
Review the answer as new evidence.
If the supplier changes the product or supplies another document, create a new submission revision. Select the updated variant and run the comparison against the appropriate approved baseline.
Do not overwrite the original finding or decision just because a new document arrives. Keep the earlier review available and record the new outcome separately.
See the procedure and the result.
Inspect the completed public-document case study, or bring your own project files and start a review.