Mat3
Start free
Core features / Reviewer decisions

Make the decision. Keep the record.

The assigned reviewer checks the findings and records approval, conditions, resubmission or rejection. The evidence and reviewed versions stay with that decision.

  • Named reviewer and recorded date
  • Corrections with a written reason
  • Outstanding required findings block unconditional approval
Actual saved draft · prepared for review and not sent

See it working

A completed test you can inspect.

Tested in the hosted Mat3 workspace
Run by the Mat3 team · no customer data

Input
The completed revision 2 findings, an assigned reviewer and unresolved required checks.
What we did
We recorded a written correction as a controlled workflow test, attempted unconditional approval, then recorded ‘Revise and resubmit’ using the assigned reviewer.
Saved result
Unconditional approval was blocked. The original machine conflict and the separate reviewer correction were both retained. The recorded decision appears in the PDF and CSV.

What the test confirmed

  • A written reviewer correction is retained separately from the machine conflict
  • Required unresolved findings block unconditional approval
  • The assigned reviewer records the revision 2 resubmission decision
  • A project reviewer cannot decide a review assigned to someone else

Completed with published documents and controlled test accounts. These are product checks, not customer endorsements or certification of material quality. Get the public test documents.

How it works

Three steps to use it.

01

Review the evidence

Inspect each required finding and its sources.

02

Record the outcome

Approve, add conditions, request resubmission or reject.

03

Keep the report

Download the saved decision and its references.

01

Resolve the findings before approval.

Read the result and its evidence. If the machine finding needs correction, the reviewer records a reason alongside it. Unconditional approval is blocked while required findings remain unresolved.

  • Original machine findings are retained
  • Corrections are recorded separately
  • Conditional approval needs explicit conditions
Inspect this feature’s evidence
Actual workspace · completed public-document paint review
02

See exactly what was decided.

A recorded decision identifies the requirements baseline and supplier revision used. Generate a PDF or CSV from that saved review and return to it later.

  • Reviewer identity and timestamp
  • Conditions and notes included
  • New supplier revisions do not rewrite older decisions
Inspect this feature’s evidence
Actual generated PDF · public-document test

Your questions

Good to know before you start.

Who can make the final decision?

Only the reviewer assigned to that review can issue its final decision. Company and project roles control access to the underlying material record.

What if the supplier changes the material later?

Create a new supplier revision and run another comparison. The previous decision remains tied to the original versions; it is not silently updated.

Bring your project documents.

Start with one requirement and one proposed product. Check the result with your reviewer.